MUR-70

Shoreline, WA

MUR-70

LOCATION

Shoreline, Washington

DESCRIPTION 

Northwest Construction, Inc. has been contracted as the subcontractor for the MUR-70 project, responsible for executing the excavation and installing utilities outside the building footprint. Our team is undertaking the excavation and removal of over 100,000 cubic yards of material from the site to prepare for the installation of the building foundation. Working closely with the general contractor, we’ve developed creative solutions to address overhead utility conflicts, ensuring the smooth progression of construction.

In addition to our excavation work, we are collaborating with other trades on-site to implement the shoring system and coordinate excavations for concrete footing pours. The removal of materials from the site is a crucial aspect of our responsibilities, aimed at maintaining the construction schedule. This is essential for timely concrete pours, allowing the building to progress into vertical construction. We are dedicated to contributing to the successful and timely completion of this project.

SCOPE OF WORK 

Northwest Construction, Inc. is tasked with excavating and removing over 100,000 cubic yards of material from the site, loading it onto trucks, and transporting it to approved dump sites to prepare for the pouring of foundations. Additionally, we are responsible for installing off-site storm, water, and sewer connections to integrate with the public utility systems for the City of Shoreline and City of Seattle, ensuring the building has necessary utility services.

One challenge we encountered involved overhead communication lines at our loadout zone near a busy road. Collaborating closely with the general contractor, we devised a creative solution to maintain construction momentum despite these overhead lines. Our team utilized the on-site footprint of the building for material loadout, ensuring the project schedule moved forward while waiting for the lines to be removed.

This project presents a unique aspect, with another building adjacent to our project site being constructed by the same general contractor. Furthermore, additional buildings are being installed in the surrounding area, leading to heavy construction traffic from various projects. Northwest Construction, Inc. remains committed to overcoming challenges and contributing to the success of this distinctive project.

PROJECT HIGHLIGHTS

  • 98,920 cubic yards of mass excavation
  • 3,490 cubic yards of structural excavation
  • 24,310 square feet of shoring system facing
  • 1,860 cubic yards of foundation backfill
  • 101,360 square feet of slab-on-grade grading
  • 3,380 tons of capillary rock installed
  • 3,750 linear feet of plumbing trench excavated and backfilled
  • Installation of sewer saddle manholes and type 2 manholes
  • 650 linear feet of 12” storm installation with 7 catch basins
  • Installation of 4” domestic water
  • Installation of 6” fire protection
  • 1,000 cubic yards of concrete foundations removed
  • 11,000 square feet of roadway, curbs, sidewalk fine-grading